Delivery Prep Checklist

A prepared site helps us place your container faster and reduces redelivery risk.

Dispatch windows are confirmed after access and placement details are validated against route capacity.

Access-First DispatchRoute timing is tied to site readiness.
Clear Delivery AssumptionsPlacement requirements confirmed before truck roll.
Lower Redelivery RiskPrep checks reduce avoidable delays.
Direct Dispatch SupportOne team for planning and scheduling.

Delivery Planning Paths

Access Path

  • Confirm route from street to drop area
  • Check width around gates and tight turns
  • Remove temporary obstructions in advance
  • Flag low overhangs and branch interference

Placement Surface

  • Use level, stable, load-bearing ground
  • Avoid soft or recently saturated soil
  • Mark exact drop location before dispatch
  • Confirm final door orientation direction

Site Safety

  • Keep bystanders clear during placement
  • Designate site contact during delivery window
  • Share gate codes or access instructions
  • Provide alternate contact if primary unavailable

Documentation

  • Include ZIP and city in quote request
  • Confirm selected size and condition class
  • Share any HOA or local placement constraints
  • Call ahead for unusual placement scenarios